ISSN: 18137148 (on-line) ISSN: 1813-713X(Print)
PERIODICAL LIST
NEW PERIODICAL CONTENTS
Volume 9, NO.2
Better Heuristics for a Two-Stage Multi-Machine Assembly Scheduling Problem to Minimize Total Completion Time
Author:
Fawaz S. Al-Anzi and Ali Allahverdi
Page:
p.66 ~ p.75
Download:
Full text available (261KB)
Green Vendor Selection with Risk Analysis
Hsiao-Fan Wang and Wei-Liang Kao
p.76 ~ p.86
Full text available (298KB)
A Multi-item Inventory Model for Two-stage Production System with Imperfect Processes Using Differential Evolution and Credibility Measure
Debasis Das, Arindam Roy and Samarjit Kar
p.87 ~ p.99
Full text available (307KB)
Apply Production Efficiency to Assess the Pay Equity of Chinese Professional Baseball Pitchers
Sheng-Pen Wang and Wei-Chih Chen
p.100 ~ p.108
Full text available (359KB)
A Clustering-Based Approach to Machine Layout Problems with Application to Precision Fabrication Processes
Chiun-Ming Liu and Ging-Ping Huang
p.109 ~ p.119
Full text available (358KB)