ISSN:
18137148 (on-line)
ISSN: 1813-713X(Print)

 

PERIODICAL LIST


NEW PERIODICAL CONTENTS




Volume 9, NO.2

Better Heuristics for a Two-Stage Multi-Machine Assembly Scheduling Problem to Minimize Total Completion Time

Author:

Fawaz S. Al-Anzi and Ali Allahverdi

Page:

p.66 ~ p.75

Download:

Full text available (261KB)

Green Vendor Selection with Risk Analysis

Author:

Hsiao-Fan Wang and Wei-Liang Kao

Page:

p.76 ~ p.86

Download:

Full text available (298KB)

A Multi-item Inventory Model for Two-stage Production System with Imperfect Processes Using Differential Evolution and Credibility Measure

Author:

Debasis Das, Arindam Roy and Samarjit Kar

Page:

p.87 ~ p.99

Download:

Full text available (307KB)

Apply Production Efficiency to Assess the Pay Equity of Chinese Professional Baseball Pitchers

Author:

Sheng-Pen Wang and Wei-Chih Chen

Page:

p.100 ~ p.108

Download:

Full text available (359KB)

A Clustering-Based Approach to Machine Layout Problems with Application to Precision Fabrication Processes

Author:

Chiun-Ming Liu and Ging-Ping Huang

Page:

p.109 ~ p.119

Download:

Full text available (358KB)


 

Copyright © 2012 Operations Research Society of Taiwan, ORSTW.